Skip to contents

The future payments of a paid triangle, as the chain ladder projects them, by calendar period, discounted with a yield curve: the best estimate of the liability for incurred claims under IFRS 17, or of the claims provision under Solvency II (before expenses).

Usage

discount_reserves(
  x,
  yield_curve = 0,
  period = 1,
  timing = 0.5,
  tail_periods = 1,
  ...
)

Arguments

x

A triangle of cumulative paid claims, or its chain_ladder.

yield_curve

The annual spot rates, as shares (0.03 for 3%), for terms of 1, 2, 3, ... years, or one rate for all terms.

period

The length of a development period in years: 1 (the default) for an annual triangle, 0.25 for a quarterly one.

timing

When the payments of a period are made, as a share of the period: 0.5 (the default) for the middle, 0 for its start, 1 for its end.

tail_periods

The number of periods over which the claims of a tail factor are paid.

...

Arguments of chain_ladder when x is a triangle.

Value

An object of class netsimr_discounted, a list with:

by_origin

a data frame with each origin's reserve (its IBNR: the undiscounted future payments), the reserve discounted, the discount and the mean term of its payments in years;

cash_flows

a data frame with a row per future calendar period: its payments, their term, the spot rate, the discount factor and their present value;

total

the reserve, the discounted reserve, the discount and the mean term.

Details

Each origin's projected payments of each future development period fall in a future calendar period, the first being the one after the triangle's latest diagonal. A payment of calendar period \(t\) is taken to be made timing of the way through it, at \((t - 1 + \code{timing}) \times \code{period}\) years, and discounted with the spot rate of that term, \((1 + r)^{-\textrm{term}}\). The claims of a tail factor beyond the triangle are paid evenly over the tail_periods periods after its last development period.

The spot rates of the yield curve are given for terms of 1, 2, 3, ... years; a term between two is interpolated linearly, one before the first takes the first rate and one beyond the last the last rate. One rate gives a flat curve.

Examples

paid <- as_triangle(simulated_motor_claims, "accident_year", "development_year", "paid",
                    cumulative = FALSE)
# a rising yield curve: 3% at one year to 3.8% at five years and beyond
be <- discount_reserves(paid, yield_curve = c(0.030, 0.032, 0.034, 0.036, 0.038))
be$total
#>      reserve   discounted     discount    mean_term 
#> 1.501854e+07 1.403594e+07 9.826068e+05 2.059123e+00 
head(be$cash_flows)
#>   period  payments term spot_rate discount_factor present_value
#> 1      1 5675170.9  0.5     0.030       0.9853293     5591912.1
#> 2      2 3516932.1  1.5     0.031       0.9552389     3359510.4
#> 3      3 2238619.4  2.5     0.033       0.9220388     2064094.0
#> 4      4 1422410.0  3.5     0.035       0.8865613     1261053.7
#> 5      5  923760.7  4.5     0.037       0.8491719      784431.6
#> 6      6  542749.1  5.5     0.038       0.8145440      442093.1